Integrated Kashang Hydroelectricity Project, HP, India

ADB funded project under clean energy programs are often not so green. Local people highlight heavy impacts on the environment, aggravated by multiple infrastructure and underestimated by poor environmental impact assessments



Description:

The 243 MW Integrated Kashang Hydroelectricity Project is proposed on the Kashang and Kerang streams- the right bank tributaries of Satluj River in Morang Tehsil of District Kinnaur in Himachal Pradesh. District Kinnaur is a Schedule V area under the Indian Constitution (with high percentage of tribal population). The origin of Integrated Kashang goes back to 2002 when a 65 MW hydroelectricity project was conceptualised under Himachal Pradesh State Electricity Board (HPSEB). However, later 3 more projects were integrated with the initial design (65 MW Kashang) to develop a 1800 crore project to be executed by the state owned Himachal Pradesh Power Corporation Ltd (HPPCL). The four stages of the project are: i. Stage I- comprising of diversion of the Kashang stream, at El. 2829 m, to an underground powerhouse located on the right bank of Sutlej near Powari village, developing a head of approximately 830 m.

See more
Basic Data
Name of conflict:Integrated Kashang Hydroelectricity Project, HP, India
Country:India
State or province:Kinnaur, Himachal Pradesh
Location of conflict:Morang Tehsil
Accuracy of locationHIGH (Local level)
Source of Conflict
Type of conflict. 1st level:Water Management
Type of conflict. 2nd level:Water access rights and entitlements
REDD/CDM
Deforestation
Land acquisition conflicts
Dams and water distribution conflicts
Specific commodities:Electricity
Water
Land
Carbon offsets
Project Details and Actors
Project details

Both Kashang and Kerang streams will be diverted into tunnels much before its confluence with the Satluj river. For Stage I, the Kashang stream which is 18 kms in length will be diverted around 8 kms before its confluence with the Satluj, whereas for Stage II and III (130 MW in total), the 45 km long Kerang stream will be diverted at around 15.3 kms. The Head Race tunnel (HRT) for Stage II and III will be 6.3 kms long with its diversion point at Lappo village. This entire stretch throughout the tunnel's length is inhabited by 8 villages-namely Pangi, Rarang, Khadra, Jungi Lippa, Aren, Tokhtu and Asrang. It will then be linked to upstream end of Stage-I on top of Pangi village and a combined power house of 195 MW will be constructed on the right bank of Satluj opposite Purbani village. Stage-IV (48 MW) , is more or less an independent project in which, Kerang stream will be diverted from Tokhtu village and power house with an installed capacity of 48 MW will be constructed just before, from where water will be diverted for the Kashang-Kerang link tunnel. [1]

See more
Project area:85.7356
Level of Investment for the conflictive projectINR 1800 Crore (approximately 285,000,000)
Type of populationRural
Affected Population:400 families
Company names or state enterprises:Hindustan Construction Co. Ltd (HCC) from India
Himachal Pradesh Power Corporation Limited (HPPCL) from India
Himachal Pradesh State Electricity Board Limited (HPSEB) from India
Himalayan Forest Research Institute, Shimla (HFRI) from India - Preparation of Environment Impact Assessment (EIA) Report
Relevant government actors:Government of Himachal Pradesh, Forest Advisory Committee (FAC), Himachal Pradesh High Court, National Green Tribunal, Environment Appraisal Committee of MoEFCC, Department of Forests (GoHP)
International and Finance InstitutionsAsian Development Bank (ADB) - ADB is funding the project under Himachal Pradesh Clean Energy Development Investment Program
United Nations Framework Convention on Climate Change/CDM (UNFCC)
Environmental justice organizations (and other supporters) and their websites, if available:Him Lok Jagriti Manch, Kinnaur
Paryavaran Sanrakshan Sangarsh Samiti, Kinnaur
Himdhara Environment Group and Action Collective
South Asia Network on Dams, Rivers and People (SANDRP)
Conflict & Mobilization
IntensityMEDIUM (street protests, visible mobilization)
Reaction stageIn REACTION to the implementation (during construction or operation)
Groups mobilizing:Farmers
Indigenous groups or traditional communities
Local ejos
Neighbours/citizens/communities
Pastoralists
Forms of mobilization:Lawsuits, court cases, judicial activism
Impacts
Environmental ImpactsVisible: Biodiversity loss (wildlife, agro-diversity), Food insecurity (crop damage), Loss of landscape/aesthetic degradation, Soil erosion, Surface water pollution / Decreasing water (physico-chemical, biological) quality, Groundwater pollution or depletion, Reduced ecological / hydrological connectivity, Other Environmental impacts
Potential: Air pollution, Floods (river, coastal, mudflow), Noise pollution, Soil contamination, Large-scale disturbance of hydro and geological systems
Other Environmental impactsSome environmental impacts have been marked as visible because the Kinnaur region (Satluj basin) has already witnessed/and is witnessing environmental degradation given the cascade of hydropower projects under construction and more planned in the region.
Stage IV of the project raises even more heckles due to its proximity to the Lippa-Asarang Wildlife Sanctuary, which is home to various endangered species including musk deer, snow leopard, yak, ibex, goral, blue sheep, brown bear, black bear and Himachal's state bird Mona [5]
Outcome
Project StatusUnder construction
Conflict outcome / response:Court decision (undecided)
Do you consider this an environmental justice success? Was environmental justice served?:Not Sure
Briefly explain:The project affected populations have stopped all the construction activities started by the HPPCL for Stage-I and II and as representatives of affected community, Paryavaran Sanrakshan Samiti has challenged both the Environmental Clearance and Forest Clearance (Stage II and III) at the National Green Tribunal.
Sources & Materials
Juridical relevant texts related to the conflict (laws, legislations, EIAs, etc)

Panchayats (Extension to Scheduled Areas) Act 1996
[click to view]

Forest Rights Act 2006
[click to view]

Schedule 5 Area
[click to view]

References to published books, academic articles, movies or published documentaries

[1] In the Name of Clean Energy: A Report on the Asian Development Bank Financed Hydropower Projects in Himachal Pradesh
[click to view]

[4] Comments submitted by local environment groups against granting of CDM to Integrated Kashang Hydroelectricity project
[click to view]

[5] Kinnaur's Curse?- Environmental Threat from Hydroelectric Projects
[click to view]

[5] India Water Portal - Drilling the hills to devastation
[click to view]

Other documents

[2] Objections to the CDM application for Integrated Kashang Project, Kinnaur, Himachal Pradesh Submitted to UNFCC by local environment groups
[click to view]

[3] Green Tribunal's Interim order on Integrated Kashang dated 23rd November, 2012 HPPCL directed by the Tribunal to not divert forest land for non forest purposes
[click to view]

Meta information
Contributor:Himdhara Environment Research and Action Collective, Himachal Pradesh, India (www.himdhara.org) and Daniela Del Bene, ICTA - UAB ( d.delbene_at_gmail.com)
Last update18/08/2019
Conflict ID:2028
Comments
Legal notice / Aviso legal
We use cookies for statistical purposes and to improve our services. By clicking "Accept cookies" you consent to place cookies when visiting the website. For more information, and to find out how to change the configuration of cookies, please read our cookie policy. Utilizamos cookies para realizar el análisis de la navegación de los usuarios y mejorar nuestros servicios. Al pulsar "Accept cookies" consiente dichas cookies. Puede obtener más información, o bien conocer cómo cambiar la configuración, pulsando en más información.